How long will it take to build an RV garage in Elko?Briefly, depending on the specifics of the RV garage, it can take anywhere from several weeks to a over a month. Why?First of all, when building an RV garage, this usually requires waiting to get a permit approved, which can take more than a week. If a standard blueprint does not fit your needs, then the garage needs to be custom-designed, which requires additional time (and cost) prior to the issuing of the building permit. Further, it is always important to consider the specifics of the soil and terrain to make sure that the foundation is a good match for supporting a big, heavy garage containing an RV (with respect for the expected flow of water on your property in Elko during the wet season). Usually, the ground is ready (and in many cases people will already have a cement driveway in place). However, if not ready, then it can take another day or more to clear the terrain of trees or bushes or just to level and pack the dirt. Once the permits are issued, the financing has been secured, and the ground is ready, then one of the next big factors that can influence how long the actual construction takes is... the weather. If there are no delays from severe weather, then the construction of the garage in Elko can begin to be built within two weeks of applying for the permit (if there are absolutely no delays relating to all of the initial "paperwork"). Many RV garages are not built on an existing driveway, so they need the foundation poured (which then must dry). The framing and roof can be built next, then the electrical wiring will be added for the garage door and lights (as well as natural light from windows). The exterior siding and interior drywall can be installed, then the garage door and opener. So, ultimately, completion time for construction of your new RV garage in Elko can range from many weeks (for a typical RV garage) up to 6 or more weeks (like if you are adding a second-story or a workshop on a custom-designed garage). |
What are the steps for building an RV garage?Before the actual construction stages, there are the pre-construction stages, including creating a basic design and building the budget. We'll detail that more in a moment. First, for people who are not sure if they want a very simple structure or something more unusual (like a loft or 2nd-story), click here to learn about getting a custom-design for your new RV garage: new garage construction FAQs.As for the typical pre-construction stages, that includes the initial inspection of the property in Elko, the architectural drafting of the blueprint (at least for custom-designed floorplans), the obtaining of building permits, and the financing of the construction. In rare cases, Elko property owners will have completed all of those steps before contacting our RV garage contractors in Elko. However, our RV garage builders can also help you to complete all of these steps of planning and preparation. Next comes the actual construction of your new garage at your home in Elko. Typically, that involves preparing the ground (leveling the earth) to be ready for pouring the concrete foundation. Then, the crew will set up the boards that will form (set the shape of) the wet concrete as it dries. Before pouring, the grid of steel rebar for reinforcement will be installed. Once the slab is poured and dried, it is ready for framing. The framing of the roof can be started and electrical wiring can be added. Once the wiring is ready, then one of the next steps is the installation of the garage door and the opener. Later, roof trusses will be attached and then the roof decking and exterior roofing (tile, asphalt shingles, etc) will be installed. At that point, the new garage addition in Elko is functional, but still not quite complete. Once all the relevant inspections have been completed by the staff of the city of Elko, then the interior walls can be finished (including insulation and drywall/ sheetrock). One of the last steps is typically the completing of the exterior with siding, stucco, and/or painting. Last, an RV garage will also need an extra-large garage door (with sufficient height for a RV to slide right under the opening without any unpleasant crunching). Also, since an RV-sized garage door is large and heavy, it is especially important that the bracing, tracking, springs and all other parts be properly installed (and maintained). | How much will it cost to build an RV garage in Elko?Typical prices range from under $45 per square foot to well over $60 per square foot. Naturally, the cost of custom garage construction jobs will be easier to estimate once the main details of the specific RV garage are clear to the estimator.There will be a few variables that will allow people to keep the basic costs low. Besides reducing the size of the garage (or the angle of the roof), another more affordable option is an unfinished interior (exposed framing) in contrast to insulation, drywall, and HVAC. Another obvious factor is the material of the exterior surface of the garage. If you have an HOA though, then you might not have as much flexibility. What about the dimensions? We have had requests for RV garages that were not only deep but wide (like 40 feet wide up to 80 feet or more). On the other extreme, some people have a small or mid-sized motor home (rather than a 30 to 45 foot "class A" RV). If your motor home is under 20 feet in length, then you may just need a relatively normal garage, but with a ceiling that is slightly higher than usual. When you contact our RV garage builders in Elko through this site, it is best to let us know your top priorities, such as "curb appeal," keeping the budget modest, urgency of fast completion, or anything else. To request your consultation now, click contact your new RV garage contractor. |